Building Retrofit Diary: Plymouth college of Further Education (PCFE), UK
This diary consists of quarterly reports of the status of the demonstration site written by the responsible demonstration partner.
General Overview
Description of the renovation and its purpose
The building was erected in 1972 using a simple non-insulated cavity wall construction and single glazed windows, all of which results in a very low insulation value. The external façades, as with many buildings of its type and age, are now in a poor state of repair, and suffer particularly because of their close proximity and exposure to the South West UK coast line, with its prevailing weather conditions. The planned renovation encompasses the external re-cladding and the internal refurbishment of this 8 storey building.
Status up to today
Meeting with LSC to clarify lack of progress with Property Strategy. LSC now confirmed happy to accept strategy mainly involving refurbishment. This will enable good progress in January 2005.