website of ecobuildings

website of the 6th framework programme

website of managenergy


BRITA-in-PuBs project is a Sustainable Energy Europe Campaign Partner



Building Retrofit Diary: Church in Hol, Norway

This diary consists of quarterly reports of the status of the demonstration site written by the responsible demonstration partner.

General Overview


Description of the renovation and its purpose

Renovation is mainly centred around energy renovation (insulation and energy supply). First of all energy need is attempted reduced through heat insulation, air leakage reduction and temperature controls. Secondly an innovative energy supply is proposed, using solar heated air. The planning process of the retrofit measures and how to include renewable energies will start in 2004. The construction phase will start in the end of 2004 / the beginning of 2005. It shall be finished in 2005 / 2006. After that a monitoring and evaluation period is planned. In order to test out some of the sets of solutions on a smaller scale first, a very small church of only under 200 m² main room and with an energy demand of close to 400 kWh/m² will be
used as full scale test facility instead of doing "laboratory" tests for the solar system. The test results will be incorporated in the proposed case study church (Hol church).

Status up to today

Design work phase proceeding according to plan. BRITA requirements incorporated into design specifications.





 

 Powered by fundanemt